finished base with the baking surface and channels

 
 

View from the back of the oven. This is the beginning of stage two of the building process. The base is completed and now comes the construction of the actual oven. The fireplace beneath is connected with the chimney below the baking surface. through  three visible channels. The base surface is filled and leveled with concrete.